Home / Notes / Factory Floor
Factory Floor

What a 30-Minute Changeover Actually Costs You

It is not 30 minutes. It is the two hours after it.

Melody
Melody Founder & CEO
Sep 11, 2026 · 5min read

A buyer with a 3,000-piece order once asked me why the unit price was 11% above the 30,000-piece quote, when the mold change only takes half an hour. Fair question. The half hour is not the cost.

The cost is the 90 minutes after it. A cold mold produces the least stable parts of the day: cavity temperatures are still equalising, the first shots carry slightly different residual stress, and needle protrusion on shot 5 is not the same as on shot 500. We scrap the first 60–80 shots after every changeover, on purpose, and we log them.

Then there is QC: the first article inspection after a changeover is a full dimensional report, not a spot check. That is another 40 minutes of a technician who is not making anything.

So when a 3,000-piece order is quoted, you are not paying for a mold change. You are paying for the 80 shots we throw away, the technician's hour, and the fact that your order shares a machine with two other brands that day. The 11% is honest arithmetic, not a small-order penalty.

Melody
Written by

Melody

Founder & CEO

In this industry since 2011 — the only one I have ever worked in. I answer every enquiry myself, and I sign off the batches that leave.

Factory Floor

Same series

Next step

Send the spec, get a real number

Not a catalogue price. The number after your quantity, your packaging and your port are in the calculation.